Set up formulas to calculate material order product quantities automatically using EagleView Premium Reports, GAF QuickMeasures, or manually entered measurements

Requirements

NOTE: Before getting started make sure you've Connected Your QXO Account and associated markets with branches.

Orders can still be placed without formulas set up, but quantities need to be entered manually.  That is why we strongly recommend investing the time in setting up formulas.

Overview

Set up formulas to make material ordering a breeze. Formulas are built using Measurement inputs, math operators (x / + -), numbers and parentheses. They are used to calculate quantities of products they are associated with using measurement data from EagleView, GAF QuickMeasure, or other sources.

 

PRO TIP: Use the Formula Guide to see examples for common roof system components. We also have a few example Measurement Inputs & Suggested Formulas listed below.


  1. Log in to your portal
  2. Navigate to the Orders tab and go to the Formulas section
  3. Click Add Formula to build a new formulaScreenshot 2025-07-08 at 14.16.32
  4. Name the FormulaScreenshot 2025-07-08 at 14.18.45
  5. Associate the Formula to Products from your QXO templates.

    Screenshot 2025-07-08 at 14.24.40

    Choose the Branch, then Template, then check the Item you want to apply this formula to.

    You can also associate multiple items to the same formula. For example:

    Screenshot 2025-07-08 at 14.37.33
  6. Build your Formula.

    Use parenthesis ( ) for order of operations. Use measurement inputs like Total Roof Area, Ridges, Hips, etc. see full listbeacon-formulas-build-instructions

  7. Double check your formula will produce the expected quantities for the associated products. If everything checks out, click Save.

    beacon-formulas-test-instructions
  8. Associate Formula to Your Templates' Products to automatically generate all quantities when ordering materials.

    To see your template(s) details and check which products have a formula, go to the Branches tab and click a template.

    You can edit and associate formulas from the formula list.

    beacon-formulas-template-review
  9. On the Formulas tab, click the three dots to the right of any formula and select Associate Formula to edit associated products.
     beacon-formulas-actions

    Associate Template products to formulas using the same process as the formula creation one above.

    beacon-formulas-associate-products-popup

 

Measurement Inputs

 

beacon-ordering-measurements-inputs-1

Full List of Measurement Inputs

 

Bath Vent  (Qty) Penetrations  (Qty) **
CDX Plywood  (Qty) Pitch  (Ratio)
Chimneys  (Qty) Plumbing Stack  (Qty)
Drip Edge  (LF) Rakes  (LF)
Eaves  (LF) Ridge Cap  (LF)
Facets  (Qty) Ridges  (LF)
Flashing  (LF) Ridge Vent  (LF)
Hips  (LF) Roof & Wall Intersection  (LF) ***
Ice / Water Eaves  (LF) Starter  (LF)
Ice / Water Valleys  (LF) Static Vent  (Qty)
Ice / Water Rakes  (LF) Step Flashing  (LF)
Kitchen Vent  (Qty) Total Roof Area (SqFt)
OSB Decking  (Qty) Underlayment  (SqFt)
Parapets  (Qty) Valleys  (LF)

 

** Penetrations = Static Vents + Kitchen Vents + Bath Vents + Plumbing Stacks

*** Roof & Wall Intersection = Flashing + Step Flashing

 

Suggested Formulas

Here is a list of suggested formulas to help get you started.

ASPHALT SHINGLES (Total Roof Area * Waste Factor / 100)*3
STARTER SHINGLES - EAVES Eaves / 100
STARTER SHINGLES - EAVES & RAKES (Eaves+Rakes) / 100
UNDERLAYMENT {Total Roof Area}*{Waste Factor}/100
ICE/WATER (Eaves*6)+(Valleys*3)+(Penetrations*6)+(Roof & Wall Intersections*3))/100
HIP / RIDGE (Hips+Ridges)/30
DRIP RIDGE (Eaves+Rakes)/250
FLASHING Flashing/50
STEP FLASHING Step Flashing/25
VALLEY FLASHING Valleys/100
HEADWALL FLASHING Flashing/10
NAILS (((Total Roof Area/100*3)*6)+((Hips+Ridges})/30*6)+((Eaves+Rakes)/100*6)*Waste Factor)/7200
CAP NAILS (Total Roof Area/100)/30
RIDGE VENTS Ridge Vent/20
SPRAY PAINT (Total Roof Area/100)/10
CEMENT Total Roof Area/2000

 

PRO TIP: See the formula being used to calculate each product's quantity.

While ordering, on the template step, you can see which formula was used to populate the product quantity by hovering or clicking the info symbol.

beacon-formulas-ordering

 

You’ve successfully set up your material ordering formulas